Oil & GasRepsol SinopecNorth Sea, UK
Repsol Sinopec, Beatrice Alpha Derrick Removal
DSL began removing a redundant 147 ft derrick from Repsol Sinopec's Beatrice Alpha platform in the North Sea, taking down the top 63 ft and associated equipment without a crane and without any LTIs.
Key Metrics
- Derrick height
- 147 ft
- Removed in first phase
- 63 ft
- Crane lifts required
- 0
- LTIs
- 0
Derrick & CMC RemovalPlatform DecommissioningRope Access
Despite routine maintenance, the redundant drilling set on the Beatrice Alpha production platform was slowly degrading to a point where it could potentially become unsafe in the future.
The client needed the 147 ft derrick and associated equipment removed from the platform. The time of year brought adverse weather that slowed progress throughout the works.