CTF Tunisia, Drilling Package Decommissioning, Upgrade and Reinstallation
Oil & GasCTF, on behalf of operator SereptOffshore Tunisia

CTF Tunisia, Drilling Package Decommissioning, Upgrade and Reinstallation

For CTF and operator Serept, DSL decommissioned the drilling package, power generation and mud treatment package from Platform 5 offshore Tunisia, upgraded them onshore and hooked them up on Platform 06, through to DNV certification of the drilling systems.

Key Metrics

Packages decommissioned and upgraded
3
Work scopes delivered
12
Drilling systems certification
DNV
Drilling Package UpgradePlatform DecommissioningEquipment Refurbishment

CTF and the operator Serept needed the Derrick Equipment Set, power generation and mud treatment package removed from Platform 5 offshore Tunisia, upgraded and refurbished onshore, then installed, outfitted and commissioned on Platform 06.

The scope combined offshore decommissioning, onshore refurbishment and offshore hook-up in a remote location, calling for offshore engineering and construction capability across every phase.

Project Gallery

CTF Tunisia, Drilling Package Decommissioning, Upgrade and Reinstallation, image 1
CTF Tunisia, Drilling Package Decommissioning, Upgrade and Reinstallation, image 2
CTF Tunisia, Drilling Package Decommissioning, Upgrade and Reinstallation, image 3
CTF Tunisia, Drilling Package Decommissioning, Upgrade and Reinstallation, image 4
CTF Tunisia, Drilling Package Decommissioning, Upgrade and Reinstallation, image 5
CTF Tunisia, Drilling Package Decommissioning, Upgrade and Reinstallation, image 6