ConocoPhillips Viking Vulcan, Decommissioning Pre-Works and Removal Support
Oil & GasConocoPhillipsSouthern North Sea, UK

ConocoPhillips Viking Vulcan, Decommissioning Pre-Works and Removal Support

DSL delivered two decommissioning packages on the Viking Vulcan gas assets, preparing them for lighthouse mode for ConocoPhillips and supporting Boskalis as 7 jackets and 4 topsides were removed in 2019.

Key Metrics

Jackets removed
7
Topsides removed
4
Man-hours without incident (operator package)
90,000+
Man-hours without LTI (2019 campaign)
38,000+
Platform DecommissioningRope AccessOffshore Brownfield

With the Viking Vulcan offshore gas production assets reaching the end of their effective life, ConocoPhillips decided to decommission them in their entirety. A significant amount of preparatory work needed to be completed before a heavy lift vessel arrived on location to remove the topsides and jackets.

The client chose to bring the assets to a state of readiness where they could be left in lighthouse mode until a heavy lift vessel could be sourced, after which the structures would be removed for recycling or disposal. The work was carried out in challenging offshore conditions across multiple phases.