Repsol Sinopec, Beatrice Alpha Derrick Removal
Pétrole et gazRepsol SinopecNorth Sea, UK

Repsol Sinopec, Beatrice Alpha Derrick Removal

DSL began removing a redundant 147 ft derrick from Repsol Sinopec's Beatrice Alpha platform in the North Sea, taking down the top 63 ft and associated equipment without a crane and without any LTIs.

Chiffres clés

Derrick height
147 ft
Removed in first phase
63 ft
Crane lifts required
0
LTIs
0
Retrait de Derricks et CMCDémantèlement de PlateformesAccès sur Cordes

Despite routine maintenance, the redundant drilling set on the Beatrice Alpha production platform was slowly degrading to a point where it could potentially become unsafe in the future.

The client needed the 147 ft derrick and associated equipment removed from the platform. The time of year brought adverse weather that slowed progress throughout the works.