For CTF and operator Serept, DSL decommissioned the drilling package, power generation and mud treatment package from Platform 5 offshore Tunisia, upgraded them onshore and hooked them up on Platform 06, through to DNV certification of the drilling systems.

Chiffres clés

Packages decommissioned and upgraded
3
Work scopes delivered
12
Drilling systems certification
DNV
Mise à Niveau du Paquet de ForageDémantèlement de PlateformesRemise en État des Équipements

CTF and the operator Serept needed the Derrick Equipment Set, power generation and mud treatment package removed from Platform 5 offshore Tunisia, upgraded and refurbished onshore, then installed, outfitted and commissioned on Platform 06.

The scope combined offshore decommissioning, onshore refurbishment and offshore hook-up in a remote location, calling for offshore engineering and construction capability across every phase.

Galerie du projet

CTF Tunisia, Drilling Package Decommissioning, Upgrade and Reinstallation, image 1
CTF Tunisia, Drilling Package Decommissioning, Upgrade and Reinstallation, image 2
CTF Tunisia, Drilling Package Decommissioning, Upgrade and Reinstallation, image 3
CTF Tunisia, Drilling Package Decommissioning, Upgrade and Reinstallation, image 4
CTF Tunisia, Drilling Package Decommissioning, Upgrade and Reinstallation, image 5
CTF Tunisia, Drilling Package Decommissioning, Upgrade and Reinstallation, image 6