Saltar al contenido

Retrofit Of Pipe Handling Systems

DSL are constantly engaged in a range of drilling structure upgrade, refurbishment, recertification and inspection work scopes on an on-going basis Worldwide. The following projects provide you with a cross section of recent projects;

December 2013
Retrofit Of Pipe Handling Systems

DSL are constantly engaged in a range of drilling structure upgrade, refurbishment, recertification and inspection work scopes on an on-going basis Worldwide. The following projects provide you with a cross section of recent projects;

DSL has worked closely with Weatherford to carry out the engineering, design and supply of the derrick modification kits for the Jack Up derricks on the ENSCO 71 and the Transocean Monarch, and in January 2014 will start the process of the same upgrade for the Ensco 70.

The design and manufacturing phases has been followed by the Turnkey installation and outfitting of the derrick modifications and Weatherfords Iron Derrick Man Racking System by DSL.

DSL also designed and fabricated the new automated Racking Board Assemblies on behalf of Weatherfords.

Galería del proyecto

Retrofit Of Pipe Handling Systems — image 1
Retrofit Of Pipe Handling Systems — image 2
Retrofit Of Pipe Handling Systems — image 3
Compartir:
OES DSL | Retrofit Of Pipe Handling Systems