Saltar al contenido
Dreco Slingshot Rig, Fast-Track A-Frame Replacement
Petróleo y gasDreco Slingshot rig operatorSingapore

Dreco Slingshot Rig, Fast-Track A-Frame Replacement

After a customer damaged the A-frame cantilever legs on a Dreco Slingshot rig during rig up, our Singapore workshop surveyed, designed and fabricated API 4F replacements ready for delivery within 15 days of the initial survey.

Métricas clave

Survey to parts ready for delivery
15 days
Fabrication specification
API 4F
FabricaciónIngeniería y Diseño

A customer damaged the A-frame cantilever legs on a Dreco Slingshot rig during rig up, leaving the rig unable to be raised and out of work.

Replacement components had to be designed, fabricated and machined to API 4F specifications as quickly as possible, without any compromise on quality.

Galería del proyecto

Dreco Slingshot Rig, Fast-Track A-Frame Replacement, image 1
Dreco Slingshot Rig, Fast-Track A-Frame Replacement, image 2
Dreco Slingshot Rig, Fast-Track A-Frame Replacement, image 3