跳至正文
Noble Valiant Crown, Turndown Sheave and Crane Ram Change-Out
海上钻井Noble Drilling

Noble Valiant Crown, Turndown Sheave and Crane Ram Change-Out

DSL supplied an IRATA rope access rig-building team to Noble Drilling's drillship Valiant to remove and reinstall the crown assembly and 16 turndown sheaves and change out the NOV knuckle boom crane rams.

关键指标

Turndown sheaves removed and refitted
16
Work scopes delivered
3
绳索作业钻机建造团队设备翻新

Noble Drilling needed an IRATA rope access rig-building team to carry out three separate work scopes onboard the drillship Valiant: removal of the crown assembly, removal and reinstallation of 16 turndown sheaves, and a change-out of the NOV knuckle boom crane rams.

All of the work had to be completed within a specific time slot to meet the client's drilling programme, and much of it involved complex rigging operations in very congested areas of the asset.