Spirit Energy, DP6 and DP8 Simplification Project
石油和天然气Spirit EnergyMorecambe Bay, Irish Sea, UK

Spirit Energy, DP6 and DP8 Simplification Project

Under a £24m EPC contract, DSL simplified process and control systems and carried out structural repairs and partial topsides decommissioning on two Morecambe Bay NUIs, removing over 500 tonnes of scrap steel.

关键指标

EPC contract value
£24m
Scrap steel removed
500+ t
Man-hours without LTI
300,000+
Rope access hours without LTI
6,234+
升级与改造平台退役海上既有设施改造

New hydrocarbon recovery technologies have extended North Sea and Irish Sea assets beyond their original life cycle, and operators are choosing to upgrade and simplify their assets, processes and control systems. Spirit Energy wanted to simplify systems on DP6 and DP8, two normally unattended installations in the Morecambe Bay production complex.

The aim was a higher level of automation, increased production efficiency and fewer routine and intervention visits to the platforms. The scope also included structural repairs and a partial topsides decommissioning of redundant vessels and drilling substructure, all delivered in challenging offshore conditions.