
Offshore Platform Derrick Removal Using a Floating Pole
For a long-term platform operator client, DSL removed a drilling derrick and drill floor equipment using its floating pole methodology, avoiding the need for a costly heavy lift vessel.
Ключевые показатели
- Heavy lift vessels required
- 0
The platform operator is a long-term DSL client for asset integrity and drilling structure work. Its projects team needed the drilling structure removed and turned to DSL because of our track record in removing drilling structures with the floating pole methodology rather than costly heavy lift vessels.
A comprehensive engineering analysis was needed to ensure, and prove, that structural integrity was maintained throughout dismantling. The platform flare was in close proximity to the drilling structure, and weather meant enough fall-back work had to be planned to keep crews productive during work at height downtime.